A practical range, not a misleading catalogue
Manufacturer-published references span compact AC chargers, several single- and multi-output DC power classes and split high-power systems. The right option depends on the local grid connection, vehicle charging curves, dwell times, payment requirements and applicable national rules.
- AC workplace and destination charging: a 7 kW Type 2 reference and assessment of 11/22 kW site needs.
- Compact and multi-output DC: 40, 160, 240 and 320 kW manufacturer examples.
- Larger site designs: configurable DC platforms and megawatt-class split cabinets.
- Site operation: power sharing, OCPP/CSMS assessment, access and payment requirements.
How manufacturing cooperation works
CowinLink coordinates technical requirements and commercial discussion with specialist production partners. Engineering, conformity files, interface options and delivery conditions are collected against the exact proposed configuration. We do not claim to own our partner’s factories, patents, installed charging stations or overseas service centres.
- Project scoping and supplier quotation coordination.
- OEM/ODM branding and mechanical configuration discussion where feasible.
- Collection of model-specific electrical, safety and conformity evidence.
- Planning for FAT, commissioning responsibilities, spare parts and after-sales scope.
European project fit
A solution that is technically usable in one market may need different metering, payment, language, grid protection or documentation in another. Public infrastructure in particular may be subject to EU AFIR and additional national requirements. Compliance must be assessed per installation country and equipment configuration.
- Identify country, site category and public/private access.
- Capture available three-phase capacity, import limit and site expansion plan.
- Specify connector count, simultaneous power, payment and CSMS integration.
- Confirm the precise document package, warranty and service arrangement.