Skip to content
COWINLINKCHARGING SOLUTIONS
EN · Languages

Equipment classes · CCS2 DC charging

Commercial DC charging: from compact to multi-output

CowinLink supports procurement planning across compact DC units and multi-output commercial chargers. Manufacturing references include a 40 kW single-connector unit, a 160 kW four-output architecture and 240/320 kW dual-connector systems. These numbers describe published equipment classes, not a guarantee that every connector will deliver the full cabinet rating simultaneously.

Representative equipment classes

These are reference classes from a cooperating upstream manufacturer. CowinLink discusses project suitability, options and technical documentation, rather than claiming all variants are continuously available.

  • 40 kW: compact CCS2 DC reference; suitability depends on connection and site demand.
  • 160 kW: multi-output reference with four CCS2 outlets; simultaneous allocation needs verification.
  • 240 kW and 320 kW: dual-CCS2 references for commercial sites.
  • 60–600 kW: supplier family marketing range; do not use a merged specification table as a datasheet.

Why nominal power is not session power

The delivered DC power is constrained by vehicle voltage, charge curve, cable/connector limits, cooling, temperature, grid capacity and simultaneous use. A 240 kW dual-connector cabinet does not imply 240 kW to each EV at the same time.

  • Request power-module granularity and allocation rules.
  • Confirm voltage/current envelope and CCS2 cable specifications.
  • Test concurrent sessions with realistic vehicle and battery conditions.

Operator features and EU fit

Authentication, metering, receipt, payment terminal, advertising display, OCPP/CSMS and remote maintenance are model- and market-dependent options. EU AFIR and national metrology/payment rules need explicit project evaluation.

  • Define public access, card or ad hoc payment expectations.
  • Request model-specific OCPP version and integration test report.
  • Confirm service network, fault escalation, spare parts and commissioning plan.

Frequently asked questions

Can multiple EVs charge simultaneously?

This depends on the selected number of outputs, total cabinet capacity, allocation algorithm and site limits. The manufacturer must confirm a simultaneous-load matrix.

Are the references CE certified?

Conformity cannot be inferred from this overview. The exact model and applicable declarations/test records must be reviewed before a sale.

Ready to plan an AC or DC charging project?

Or email team@cowinlink.eu with your requirements.

Start a technical RFQ →