7 kW AC Wallboxes and Workplace EV Charging

Evaluate 7 kW single-phase AC charging and the differences from 11 kW or 22 kW requirements. Available delivered power depends on the site, vehicle, phases and protection design.

Design decision

AC charging uses the vehicle’s onboard charger. At an illustrative 230 V and 32 A single-phase supply, 230 × 32 / 1000 is approximately 7.4 kW before losses. At 400 V three-phase, √3 × 400 × 16 / 1000 is approximately 11 kW; doubling current to 32 A gives approximately 22 kW. These examples assume a suitable supply and power factor near one. They do not establish a charger’s approved input or output. Mode 3 describes a controlled AC charging arrangement; Type 2 describes an interface, not a charging-power guarantee.

When this approach fits · Limits and alternatives

Long stays can make lower power practical. A vehicle with a single-phase or lower-rated onboard charger cannot automatically use a 22 kW AC installation at its nameplate rating. Short dwell times may instead require a DC option. Ask the installer to specify earthing, circuit protection, residual-current protection and any DC leakage detection for the exact unit; the presence of a 6 mA detector alone does not prove a complete protective design.

Procurement checks

  • Confirm target-market Type 2 and 230 V/400 V electrical requirements
  • Request RCD and 6 mA DC residual-current detection evidence
  • Check vehicle onboard charging limit, phases and cable specification

Evidence to request

Define the installation country, supply, arrival and departure times, energy per session and operating constraints. Ask for an electrical design, exact configuration, test evidence and acceptance plan. Include support responsibilities and data ownership in the written scope.

Evidence to request

An original procurement guide using general engineering principles and public standards context. Links explain the subject; they do not certify any equipment.

Discuss a project

Define the installation country, supply, arrival and departure times, energy per session and operating constraints. Ask for an electrical design, exact configuration, test evidence and acceptance plan. Include support responsibilities and data ownership in the written scope.

Discuss a project →

← EV charging equipment & project solutions

We do not currently use optional analytics, advertising or tracking cookies. Essential website functions and protective hosting mechanisms may operate where permitted.

Strictly necessary
Required when used
Analytics
Not installed or active
Advertising / marketing
Not installed or active

If optional tracking is introduced later, it must remain disabled until any required consent is obtained.